For OEM comissioned business, Fine Pro provides an integrated process including creation of a mock-up of a planned item, metal mold casting, plastics molding, assembly in a clean room and gamma sterilization of the end product. In addition to plastics molding using a single material, we can make liquid silicon integral moldings (insert molding of polycarbonate (PC) resin and liquid silicon) suitable for practical use. They are recommended for planning a product that requires a high performance in sealing.
You can rely on the quality of our products because they are produced at a plant certified with ISO 9001 (standardization for quality management systems) and FSSC22000 (Food Safety System Certification). If you are thinking of creating your own brand of goods, please do not hesitate to contact us.
Medical
Physics and Chemistry
Automobile, industrial and OA
Flow of OEM commission process
We have established an integrated process from product design assistance, metal mold design, mold building to molding and assembly of a product.
STEP 1
Establishing a product image
In a face-to-face meeting or via online conversations, we establish full details of a customer’s requirements.
STEP 2
Drawing up a rough sketch and making a 3D proposal
Based on these conversations, we convert the product image into a tangible form.
STEP 3
Customer evaluation and discussion of target cost
In collaboration with the customer, we work out the details.
The stages up to this point are totally free of charge.
Please feel free to contact us.
STEP 4
Detailed design
We design the required product with your target cost in mind.
STEP 5
Customer review and submission of a quotation
STEP 6
Creation of sample, with 3D mock-up
Please be aware that sample costs will be incurred at this stage.
STEP 7
Submission of specifications (2D drawing) and customer confirmation
Please be aware that design costs will be incurred at this stage.
STEP 8
Metal mold casting
Please be aware that molding costs will be incurred at this stage.
STEP 9
Test production, approval of first products and discussion of a package specification
Initiation of mass production and delivery of products